Why is the ICC so empty? How long will it stay that way?

from Greater Greater Washington by Ben Ross

Travelers on Maryland's newly-opened Intercounty Connector (ICC) highway see a road that seems empty and overbuilt. Yet the Maryland Transportation Authority, which runs the road, says that traffic is slightly heavier than forecast. Can both be right?

Yes, they can.
...
But the state's forecast also assumes that gas will cost $2.50 a gallon, adjusted for future inflation. If instead, gas costs $10 a gallon in 2030, traffic on the ICC is projected to be about 40% below the $2.50/gallon forecast.
...
There's nothing at all wrong with building for the future. The planners of Metro thought big, and we are all better off as a result. The question about the ICC is whether it was built for the future, or for a past age of cheap gasoline and sprawl that is gone forever.

.
<a href="http://greatergreaterwashington.org/post.cgi?id=13216">http://greatergreaterwashington.org/post.cgi?id=13216</a>;

Comments (0)


Baltimore Spokes
https://www.baltimorespokes.org/article.php?story=20120103193015784